原文由 Egomessia(v2909302) 发表:
项目: 2x37 MW Cogeneration Power Project
地点:Rahim Yar Khan Pakistan
采购设备:成套电厂实验室设备
1. Lab Equipment— Raw water, boiler makeup water, boiler water, boiler feed
Water, saturated steam, super-heated steam & condensate
2. Lab Equipment— Fuel Analysis
3. Lab Equipements - Total Silica Analysis
附件是标书预览,请有意向的朋友尽快与我联系!
qq 85224107