B) A marker injection is made. C)Electric field is applied for a fixed time (tv) to electroosmotically move the marker band. D) A second marker is injected to demark the end of the electrolyte plug. E) Upon application of a pressure differential between inlet and outlet ends, the marker-sandwiched electrolyte plug reaches the detection window and the traveling times for the two marker bands are recorded in the usual manner.
4楼说的没错,你的程序是否是: B injection C separation D injection 至于E,我不是很明白你的意思。 你是想只是施压,然后手动记录marker bands 的迁移时间?但是这样的话你通过什么方式监测maker呢?只有separation的模式下PC才会给出电泳图的哦。
4楼说的没错,你的程序是否是: B injection C separation D injection 至于E,我不是很明白你的意思。 你是想只是施压,然后手动记录marker bands 的迁移时间?但是这样的话你通过什么方式监测maker呢?只有separation的模式下PC才会给出电泳图的哦。